Salt Creek Greenway Trail Construction Photos April 11, 2008
This is page one. View
page two
.
The bridge is arriving by flat-bed truck, headed south on Rt. 83 just south of the Metra track underpass.
The crane is being attached to the bridge. Elmhurst water tower (83 and St. Charles) in the background.
Bridge, with decking already in place, is lifted off the truck and begins its journey to the river.
Slowly working its way out over Salt Creek, swollen from the rain the night before, as the crane crawls forward.